Contact

Make intake clearer so follow-up can be faster

This phase keeps a practical inquiry entry point in place; broader conversion workflows can expand later.

Program Collaboration

Clear inputs and response checkpoints accelerate new program reviews

Drawings, material targets, annual volume, and validation needs are enough to start a practical prototype-to-production review.

Quality Assurance

Quality records, inspection gates, and escalation paths stay aligned

Each production checkpoint is backed by standardized inspection, document control, and change tracking.

RFQ Workspace

Structure the request before sending the inquiry

This page lets sourcing or engineering teams select relevant work items, add timing and attachment notes, and send a structured inquiry through a static-site-friendly flow.

This summary is stored only in localStorage on the current device and is not sent to a server directly.

Precision stamping

Used for new-part review, production transfer, and dimensional checkpoint alignment.

BRK

Precision stamping

Stamped brackets and retainers

For control enclosures, energy equipment, and industrial structural parts.

  • Dimension-critical part
  • New-program launch

Recommended attachments: drawing revision, material target, and finish requirement.

DFM

Precision stamping

Progressive tooling and sample review

Used to review forming risk, tooling conditions, and sampling milestones.

  • Forming feasibility
  • Sampling checkpoint

Recommended attachments: critical dimensions, appearance criteria, and target sample timing.

Secondary processing

Used for deburring, bending, tapping, and pre-shipment process integration.

FIN

Secondary processing

Deburring and surface finishing

For parts that need stable edge quality and appearance consistency.

  • Appearance-sensitive part
  • Pre-shipment finishing

Recommended attachments: appearance sample, acceptance criteria, and packing notes.

TAP

Secondary processing

Threading and fixture-assisted parts

For secondary precision work and pre-assembly preparation.

  • Fixture alignment
  • Secondary-process control

Recommended attachments: thread specification, fit tolerance, and fixture notes.

Assembly and kitting

Used for multi-part integration, packing checkpoints, and supplier coordination.

ASM

Assembly and kitting

Subassembly and packing kits

For programs that need staged packing by workcell or customer checkpoint.

  • Staged line feed
  • Packing checkpoint

Recommended attachments: pack method, labeling rule, and kitting list.

DOC

Assembly and kitting

Quality and delivery document packs

For programs that need shipment documents, lot identity, and inspection records aligned.

  • Document cadence
  • Lot traceability

Recommended attachments: required record list, update cadence, and shipment timing.

Sales Desk

service@ronjye.com.tw

Use this route for program review, quality document questions, public resource guidance, or recruiting follow-up.

Service Line

+886 2 0000 0000

Use this route for program review, quality document questions, public resource guidance, or recruiting follow-up.

Inquiry Intent

Static intake path

The structured workspace builds a mail-ready summary locally before the inquiry is sent through direct contact channels.